Problems with Renovation or Home Building Work: What to Do

中文English
Knowledge Base › Renovation and Home Building
Renovation or home building
gone wrong: what now?

The job keeps running late, the builder wants more money halfway through, or leaks and cracks appear after completion. This page explains South Australia’s basic rules for domestic building and renovation work, and which evidence carries weight.

Legal Information Scope Domestic building work in South Australia Updated November 2026

1Typical scenarios

A renovation crew recommended by a friend, no contract, paid in cash

To save money and hassle, a price was agreed verbally and work started. Halfway through the crew stopped turning up, or the job was finished with a host of problems and nobody can be contacted.

Halfway through, they demand more money and stop work if you won’t pay

The builder says material prices have gone up or they have found work that wasn’t originally allowed for, and demands an extra sum on top of the original price or they won’t continue.

Leaks and cracks appear a year or two after completion

The final payment was made long ago. When you contact the original builder, they say the warranty period is over, or that the problem was caused by how the occupants used the home.

2What the law says

  • Domestic building work requires a licenceIn South Australia, a contractor taking on building or renovation work must hold the appropriate building work contractor’s licence. Licence details can be checked on the public register of Consumer and Business Services (Consumer and Business Services).
  • Domestic building work above a certain value must have a written contractThe Building Work Contractors Act 1995 (SA) sets specific requirements for domestic building work contracts. Where the contract price reaches the statutory threshold, the contract must be in writing and contain the prescribed content, and the owner has a cooling-off period. For contracts entered into from 10 November 2025, the threshold is $20,000; for earlier contracts it is $12,000.
  • Deposits and price increases are both restrictedThe law caps the deposit that can be taken before work starts. Once the contract price is fixed, the contractor cannot raise it at will; variations and price increases must have a contractual basis and be recorded in writing.
  • Quality of work is protected by statutory warranties, regardless of what the contract saysThe law requires the contractor to carry out the work in a proper and workmanlike manner, use good and proper materials, comply with the law and standards, and finish on time. These warranties cannot be excluded by contract, and a subsequent owner who buys the home can also rely on them.
  • Building indemnity insurance protects the ownerFor domestic work above a certain value that requires approval, the contractor must take out building indemnity insurance before work starts. If the contractor dies, disappears or becomes insolvent, the owner can claim on the insurance. Work done without a contract or a licence usually has no such insurance.
  • Give the contractor a chance to fix it firstWhen you find a defect, you should first notify the contractor in writing and give a reasonable time to rectify it. If you get someone else to fix it without notice and then claim the cost from the original contractor, you may run into difficulties.

3Evidence checklist

These are the documents you will usually be asked for in a building or renovation dispute. Tick what you already have and see what is missing.

Have
0 / 9

4Time limits

5 years

Time limit for bringing proceedings on the statutory warranties

Runs from completion of the work. A “one-year warranty” written in the contract cannot shorten this period.

Cooling-off

After signing a domestic building contract, the owner has a short period to change their mind

Counted in business days; the number of days is as set by the current rules.

Act early

Give written notice as soon as you find a problem

The longer you wait, the harder it is to prove the problem was caused by the construction rather than later use or ordinary wear and tear.

5Common misconceptions

Paying cash with no contract saves a lot of money

Without a contract it is hard to prove the agreed price and scope. If the contractor is unlicensed, there is usually no insurance either, so if they disappear or go broke there is no insurance to claim on.

The contract says one-year warranty, so after a year there’s nothing I can do

The statutory warranties are not limited by the contractual warranty period, and last much longer than a year.

I bought the house second-hand, so I can’t go after the original builder for defects

The statutory warranties pass with the house, and a later owner can rely on them within the time limit.

He wants more money and will stop work if I don’t pay, so I just have to accept it

A price increase after the price is fixed needs a contractual basis. Stopping work without one may be a breach of contract by the contractor.

If I hold back the final payment, he’ll come back and fix it

Refusing to pay the final instalment without good reason may itself be a breach by the owner. You should explain in writing why you are withholding payment and which defects it relates to.

I’ll get someone else to fix it first, then send him the bill

Without first notifying the contractor and giving a chance to rectify, a later claim may run into difficulties, and once the repair is done the original evidence is gone.

6Disclaimer

This page is general legal information, not legal advice about your personal circumstances.Every project has different contracts and facts, and the outcome will differ. Before making a decision, please consult a lawyer holding a current practising certificate.

This page reflects the law as at the date it was updated. This page covers domestic work only; different rules apply to commercial work.